PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA

Customization: Available
Metal Coating: Copper
Mode of Production: DIP SMT

Products Details

  • Overview
  • Main Customers
  • PCB Showcase
  • PCBA Showcase
  • SMT & DIP Workshop
  • Test and Maintenance Workshop
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
PCBA
Condition
New
Quality Test
Aoi, 100% E-Test
V- Cut Tolerance
+-10mi
Bevel Edge
+-5mil
Hole Location Tolerance
+-2mil
Hole Diameter Tolerance
+-0.05mm
Board Thickness Tolerance
+-5%
Line Width/Space Tolerance
+-10%
Transport Package
Box
Specification
<1500mm
Trademark
PS Electronics
Origin
China

Product Description

PCBA Abilities

Item PCBA Abilities
Turnkey Service  PCB Design + PCB FAB + Components Sourcing + PCB Assembly + Package
 Value-Added Services BOM Analysis, Conformal Coating, IC Programming, Wire Harness & Cable Assembly, Box Building
 Assembly Details  5 SMT + 2 DIP (Dust and anti-static lines)
 Assembly Abilities SMT 5 million points per day
DIP 10 thousands pieces per day
 Technical Support  Free DFM/A check, BOM analysis
 Handing Standards  IPC-A-600H, IPC-A-610F, J-STD-001F
MOQ  1 piece
 Inspection & Testing  Visual Inspection, AOI, SPI, X-ray inspection. First article inspection for each process.
 IQC + IPQC + FQC + OQC Inspection Flow
 Flying probe test/In-circuit test/Function test/Burn-in test
 Files We Need  PCB: Gerber (CAM, PCB, PCBDOC)
 Components: Bill of Material (BOM list)
 Assembly: Pick-and-Place file
 Functional test: Test Guide
 PCB Panel Size  Min: 0.25×0.25 inches (6×6mm)
 Max: 20×20 inches (500×500mm)
 PCB Solder Type  Water soluble solder paste, RoHS lead-free
PCB Assemble Methods SMT, THT & Hybrid, single or double side placement,
Part removal and replacement.
 Components Details  Passive down to 0201 (01005) size
 Press fit connectors
 QFP/BGA/LGA/QFN/COB/COF
 CSP/WLCSP/POP
 Fine Pitch High Pin Count Connectors
 BGA repair and reball
 Lead Time  Prototype: 5-15 working days;
Mass production: 20~25 working days.
 The fastest delivery time is 3 days.
 Packaging  Anti-Static Bags/Customized Packaging


PCB Parameters

Item PCB Parameters
Material FR4 (140Tg, 170Tg, 180Tg), FR-406, FR-408, 370HR, IT180A, Metal Core, Polyimide, Rogers 4350B/3003/4003C/5880, Taconic, etc
Material Brands KB, ITEQ, SY, ISOLA, Rogers (Arlon), Ventec, Laird, Nelco, Bergquist, DENKA, Panasonic, Taconic, or other laminate on customer's request
Layer Count 1-40
Flammaility UL 94V-0
Thermal Conductivity 0.3W-300W/mk
Quality Standards IPC Classes 2/3
HDI Build-up Any Layer, up to 3+N+3
Board Thickness 0.2~7mm
Min Thickness 2-layer: 0.2mm
4-layer: 0.4mm
6-layer: 0.6mm
8-layer: 0.8mm
10-layer: 1mm
More than 10 layers: 0.5*Layer Count*0.2mm
Copper Thickness 0.5-20oz
Inks Super White Inks/Solar/Carbon Inks
Solder Mask Thickness 0.2mil-1.6mil
Surface Finishes Bare Copper, Hasl lead-free, ENIG, ENEPIG, Gold Fingers, OSP, IAg, ISn, etc
Plating Thickness HASL:
Copper Thickness: 20-35um Tin: 5-20 um
Immersion Gold:
Nickel: 100u"-200u" Gold: 2u" -4u"
Hard Plated Gold:
Nickel: 100u"-200u" Gold: 4u"-8u"
Golden Finger:
Nickel: 100u"-200u" Gold: 5u"-15u"
Immersion Silver: 6u"-12u"
OSP: Film 8u"-20u"
Min Hole Size 0.15mm
Min Trace Width/Spacing 2mil/2mil
Via Plugging 0.2~0.8mm
Line Width/Space Tolerance ±10%
Board Thickness Tolerance ±5%
Hole Diameter Tolerance ±0.05mm
Hole Location Tolerance ±2mil
Layer to Layer Registration 2mil
S/M Registration 1mil
Aspect Ratio 10:01
Blind Vias Aspect Ratio 1:01
Outline Tolerance ±0.1mm
V- CUT Tolerance ±10mi
Bevel Edge ± 5mil
Warp and Twist ≤0.50% (max cap)
Quality Test AOI, 100% E-test
Value-Added Services DFM Check,  Expedited Production
Featured Processes Bonding, Impedance Control, Via in Pad, Press Fit Hole, Countersink/Counterbore Hole, Castellated Vias, Edge Plating, Peelable Solder Mask, Resin Plugged, Plating Flat
Data Formats Gerber, DXF, PCBdoc, ODB++, HPGL, BRD, etc
 

One-Stop OEM PCB Assembly Professional Turnkey PCBA
 

COMPANY PROFILES
Pinsheng Electronics started to provide contract electronics design and manufacturing services in 2008, we are obsessed with providing the happiest manufacturing experience to our customers.

When our founders found it difficult to get technical support and always high-quality products from the manufacturers, they sprouted the vision to provide blissful electronics manufacturing services to others, they rented an old workshop and started the journey.

In over 15 years, with the same vision, we have designed, manufactured, and delivered 5,000+ projects for over 2,000 SMEs. The products are alive to us, not lifeless pieces of stuff.PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
Main Customers

Main Customers

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA

Process

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
Cases
Underwater Lighting

·High thermal conductivity
·Thermoelectric separation
·0.15mm Inner core
·Micro bump etching
·0.1mm Between FR4 and copper


Industrial BMS
·4-Layer PCB
·6OZ Inner layer copper
·Edge plating
·High current design


EV Charger Pile
Turnkey PCB assembly for control board of EV charger pile.

Medical Equipment
·Large area of ENIG
·Custom red soldermask
·6-Layer rigid-flex board


Communication Equipment
·6-Layer rigid-flex board
·10% Differential impedance
·Ventec PPV447
·ShengYi FR4
·DuPont laminated

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
PCB Showcase

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
PCBA Showcase

PCBA Showcase

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
SMT & DIP Workshop

SMT & DIP Workshop

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
Quality And Policy:

Continually improve our quality, efficiency, service to satisfy thecustomer's requirement.

Quality System:

1. ISO-9001:2018 Quality System Standard
2. ISO14001 Environment System Standard
3. Quality Standard: IPC-610-D class 2,
4. Soldering Standard: J-STD-001 class 1,2,3
5. ESD Standard: ESD-MIL-STD-1686
6. Workshop management:5S
7. FAI-first article inspection 
8. In process visual inspection
9. AOI inspection
10. X-ray Inspection
11. SPI Inspection
12. Machine calibration and preventative maintenance

13. ERP material and process management ( ERP=enterprise resource planning computer system)

Quality standards
IPC-A-610D-G

Material Control
Material Brand ShengYi, NanYa, ITEQ, Ventec, etc
Regular Thickness 0.8mm, 1.0mm, 1.2mm, 1.6mm, 2.0mm
Normal Size (FR4 Sheet)
(length x width mm)
1220x914, 1220x1016, 1220x1066
1232x927, 1295x1092, 1280x1080
1245x940, 1245x1041, 1245x1092
Normal Size (MCPCB Sheet)
(length x width mm)
1000x1200, 1050x1250
Key inspection items 1.Manufacturer Brand; 2.Material certificate;
3.Appearance of the material; 4.Dimension;
5.Sample checking.

The qualified material must be marked with the relevant material inspection certificate, then qualified material will be saved to warehouse.

#Quality Assurance
PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBAKey Specifications Quality Control Under Production Process
Our production department start proceed according to:
       -MI (Manufacturing instruction), and strictly follow below
       -PQA ( process quality assurance), to guarantee the quality.


Production Control
#Main Person in Production Workshop:
-Technical Manager
>= 3 years of relevant work experience

-Engineers
>= 5 years of relevant work experience
Be fluent in English
Familiar with PCB circuit layout and design software (Altium, Protel, PowPCB)
Master PCB manufacturing and fabrication process

-New employees
Need to pass the Pre-job training


#Main Production Equipment
About the production equipment, our company has advanced and professional production equipment to ensure good and high quality.
Equipment Function
Inner and outer AOI machine It can perform AOI detection on inner and outer layers, confirm whether the circuit is qualified and access.
AVI Before FQC visual inspection, intercept bad appearance effectively and play the role of double insurance
VCP Pattern Plating line The electroplating quality is more stable than the traditional electroplating line and greatly improves the output
Ionic contamination tester This machine is needed in the physics laboratory to test the degree of ion contamination of the circuit board and avoid risks

#Unqualified Control Process
Regarding the management of non-conforming products in the production process, our company strictly follows the "non-conforming product management procedures".

       Quality control department,
       Engineering department,
       Production department,
       QA department,
       Business department
are responsible for resolving problems together.

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
Quality Management
PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
IQC (Incoming Quality Control)
PQC (Process Quality Control)
First Article Inspection, PQC will go to each production machine for inspection every 2-4 hours (size, appearance).
Quality management of semi-finished products in each process. We will send 2-5pcs semi-finished boards of each shift to the quality inspector until they confirm then continue production.
Operator charge the quality inspection for the subsequently semi-finished boards, sign confirmation after approved. Quality inspector random inspections. Only they are qualified can be handed over to the next process.
FQC (Final Quality Control)
(That is the finished product inspection before shipment), appearance inspection 100%, random inspections of board dimension by batch.
FQA (Final Quality Assurance)
According to the inspection standards of FQC sampling verification, and finally control quality, and then double guarantee the PCB quality.
 
Test and Maintenance Workshop

Test and Maintenance Workshop

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
STHL provide custom test service according to client's requirements and products. Usually STHL PCBA Tech
offers a full range of testing service. Including:

*AOI (Automatic Optical Inspection)
* Function Testing
* In Circuit Testing
* Testing Fixtures
* Testing Service
* X-Ray for BGA Testing
* Printing Solder Paste Test

Each board is carefully examined by our dedicated inspection  team using AOI and high magnification viewers.
Using our X-Ray machine, we test PCBs to component level and all wiring is fully inspected and tested. Flash 
testing and earth bonding tests can also be undertaken where required.


Material Management
PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA

Warehouse Management
Regarding warehouse management, we will divide different areas according to different customers and place customers' products neatly.
And the warehouse administrator will responsible for managing, and ensure the records for outbound and inbound, we strictly follow the Warehousing Requirement Documents to manage all the goods.
PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
Certifications

CERTIFICATIONS

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
Packaging & Shipping

PS One Stop Service EMS Factory Produce Defibrillators and High Quality PCBA
FAQ

FAQ

Q1: What's your monthly capacity of PCB assembly
A: Monthly 140 million points from SMT, 300K pieces from DIP.
Q2: How do you go quality control in PCB assembly?
A: We fully comply with ISO requirements and process in accordance with the Quality Management Manual for order management, production management, and process management, and strictly implement processes such as corrective and preventive measures and change management.
Q3: Can you source parts for me even if no assembly need?
A: Absolutely please provide us with your BOM or a list we will analyze the source make classified packaging attached with labels then send them to you.
Q4: What is your components procurement capability? Which supplier do you work with directly?
A: We have more than 40,000 part models in stock, and provide you with hard-to-get chip supply. Our parts are directly from the top level suppliers such as Microchip, TI, ARROW, AVNET, FUTURE, ELMENT, Digikey...
Q5: How do you go inventory management?
A: According to ISO process warehouse management operation guideline, we observe the principle of first-in-first-out of materials, and control the temperature (constant 25°C) and humidity (40% RH) of the warehouse with strict anti-static. Stock materials are managed separately according to different customers.
Q6: How are EOL (End of Life) materials handled? Is it possible to provide the successful case of replacing EOL material?
1. If EOL happens in the running projects, the agent will send a production stoppage notice (Order & Supply deadline), and then our clients will get notified with our alternative suggestions.
2. For the projects transferred from other production source, we will source alternatives in advanced, or come up with and help our clients to change the design if no exact match alternatives.
3. For other cases, we will try to meet the short-term needs of customers based on our understanding of the market inventory situation.
Q7: Do you provide IC programming and fixture creation?
A: IC programming is available for all of our customers, please provide the guidelines and software, it can be done by IC burner or motherboard burn-in. We can make the fixtures as customers' requirements.
Q8: What test methods do you provide?
A: The boards will go through AOI, X-ray, default circuit testing, function testing in regular, and more testing as required.
Q9: What's the lead time?
A: It depends on the quantity and BOM. For usual small batches, it takes about 3-5 weeks, when it comes to mass production for forecast orders, we will schedule the production about 10-12 weeks before delivery.
Q10: How do you ensure delivery on time?
A: We generally guarantee delivery within 5 days after the material is ready (except for rush orders), our measures include:
1. receiving and verifying the files prior to quotation;  
2. ensuring all the materials get ready on time and be checked at the same time;
3. making PCB boards and stencil according to Gerber first;
4. communicate in time when prototyping is running to ensure that problems are handled on the same day.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours